Project PDF

Transkrypt

Project PDF
Stabilizacja skarp
RUTA T-350 VALDIVIA - NIEBLA, CL
RUTA T-350 VALDIVIA - NIEBLA
Stabilizacja skarp
Projekt
Ulica
miejsce
kraj/region
Ruta T-350 Valdivia - Niebla
T-350
Región de los Ríos
Chile
Rok instalacji
2015
klient
Projektowanie
Wykonawca
Ministerio de Obras Públicas - Región de los Ríos
Ministerio de Obras Públicas
Constructora Socal
Situation
In June of 2013 a landslide interrupted the traffic on route T-350 between Valdivia and Niebla. Heavy
rainfall in the region caused the soil to lose adhesiveness and to augment the density.
opis
The Gewi 32 mm nails used to stabilize the slope were 6 meters of length. The distance between the
nails is 2.5 meters horizontally as well as vertically.
To protect the slope from erosion caused by rain, a Geobrugg antierosion mat Tecmat was installed
beneath the high-tensile steel wire net TECCO G65/3. It also helps to revegetate the slope.
After the installation normal traffic on the route was flowing again.
Chroniony Objekt
Systemy
Road
®
TECCO G65/3
zabezpieczona powierzchnia
4500 m²
Wysokość skarpy
Nachylenie skarpy
50 m
40 ° - 50 °
środki ochronne
Active slope stabilization, Combined (active - passive)
Greening
Yes
W razie pytań prosimy o kontakt ze specjalistą Geobrugga.
Eberhard Gröner
Project Manager North-West Germany, Regional Manager UK
Phone +41 71 466 81 57
Mobile +41 79 421 17 01
[email protected]
Geobrugg AG
Aachstrasse 11 | 8590 Romanshorn | Szwajcaria
[email protected] | www.geobrugg.com
Ein Unternehmen der Gruppe BRUGG | ISO 9001 zertifiziert
Stabilizacja skarp | Ruta T-350 Valdivia - Niebla, CL
2/2

Podobne dokumenty