Slajd 1 - Janrom

Transkrypt

Slajd 1 - Janrom
Our company was established in 2002
•
•
•
•
•
We developing concepts and advise
Designing
Estimating cost
Instaling & programing
We service
From conception to implementation
 Fire alarm system SAP
 Voice alarm system DSO
 Gravitional smoke removal system
 Ventilation control system
 Extinguishing control sytem
 Fireproof systems of installation transition
 Immunization of buildings construction
 Telecommunication instalations LAN, CCTV,
SSWiN+KD and other applicable in public buildings
Buildings safety
 Esser – IQ8 Control
 Bosch Security System (SAP FPA 5000,
DSO Praesideo, Plena)
 ADI International – SAP Algorinet, DSO Sinaps
 Siemens – Synova, Algorex
 ADT – SAP Zettler, DSO Audix
 GE Interlogix – FAP
 Polon Alfa - SAP Polon seria 4000
 D+H i Mercor
 Ambient System – Schrack, Venas
QUALIFICATIONS
AND TRAINING
REALIZED
INVESTMENTS
PGE ARENA GDAŃSK POLAND
STADIUM ON EURO 2012
Hotel "D" ARKA-MEGA
Kolobrzeg Poland
design and construction of a
comprehensive fire protection fire alarm system SAP, Voice
Alarm System DSO, smoke
ventilation systems and
staircases gravity control
Hotel used as the headquarters of the Danish
football team during
championship
Euro 2012
REFERENCE
I hereby give reference letter JANROM company based in
Gdansk Brylantowa Street 2-3. Company Janrom performed for our
low-current systems, fire protection systems - fire alarm, voice
alarm system and burglar alarm system.
These installations have been performed at the Old Brewery
Kosciuszko Street in Poznan.
The Company has complied with its scope was exemplary
despite numerous changes in decision-making on the part of the
investor and documentation discrepancies.
The Company has prepared a fire alarm system to the building
management together with BMS and BMS contractor led to the
overall acceptance of works.
CD i DN in Szczecin
Bosch FPA 500 + control, LAN, CCTV, automatic.
PAZIM Sp. z o.o. Plac Rodła 8, 70-419 Szczecin
We prepared project and assembly fire resistant seals and
installation transition on the border of fire zones to the order of
main contractor ERBUD S.A. Szczecin ul. Mostnika 22.
Doll Theater „PLECIUGA”
Szczecin, Plac Teatralny 1
We prepared executive project and
implemented : SAP, CCTV, SSWiN and
LAN with telephone exchange. We also
made hardening of building steel
construction by fire retardant paint and
fire-resistant seal of transitions and joints
at the borders zones of fire commissioned
by main contractor ERBUD S.A.
Szczecin, ul. Mostnika 22.
Despite of difficulties during investor
reception( by ECE SA Warszawa)
Our company completed work without
fault.
ARKADA Office
Poznań, Obornicka Street 229 –
We prepared executive project and
electromagnetic installation (transformer
station, switching SN 15kV, switching NN,
automatic SZR) and all low voltage
installations (fire alarm system, CCTV,
structural network, anti-theft system).
Commissioned by main
contractor ERBUD S.A.
Poznań department.
Shopping Gallery
CH TURZYN
Szczecin
Museum of Technology Szczecin
fire alarm system Esser, CCTV,
LAN, system intrusion and other
Shopping Gallery PIAST Szczecin
gravity smoke extraction in the roof
Petrobaltic Gdańsk
Fire Alarm System Bosch FPA
5000 + automatic control

HORIZON Gdańsk Przymorze apartment - design and
construction of fire-resistant sealing system passages fire
zones on the border on behalf of the main contractor
EKOLAN SA Gdynia, ul. Wielkokacka 2nd
Covered market „Pod Wieżą” in Słupsk
Project, assembly and starting the notification system of the fire with assembly of gates and firefighting door steered by anti-fire system , smoke removal system and acoustic alarm system
Jantar Gallery in Słupsk
FAS Esser i VAS Bosch Preasideo
help in execution
Paulinum Palace
in Jelenia Góra
FAS Sagitta 100
+ automatic control
Apollo Residence
in Karpacz
FAS Sagitta 100
+ automatic control
Alma
Market
Sopot
Sikorskiego 8-10 – SAP
ul.
Polon
4000; projekt i wykonanie uszczelnień
ognioodpornych przejść instalacyjnych na
granicy stref pożarowych na zlecenie
głównego wykonawcy IXO Serwis 47-200,
Kędzierzyn - Koźle, Piastowska 40.
Hotel Rejs w Ustce
FAS Bosch FPA 5000
+ automatic control
Regional Hospital in Slupsk
fireproof sealing sanitary
State Higher Vocational School Elbl
Sanatorium Centre
Klimczok
FAS Polon Alfa + gravity smoke extraction
Ustronie Morskie
FAS Bosch FPA 5000
Aquapark FALA
Łodź FAS Bosch
FPA 5000 + gravity
smoke extraction
Hotel „Wodnik” Łeba
FAS Polon 4000 - design and
implementation of a comprehensive
fire protection
Sanatorium Centre Natura Tour Radość Ustka
- design and implementation of a comprehensive
fire protection - fire alarm system FAS Bosch
FPA5000, VAS Voice Alarm System.Bosch
Northern Shipyard Gdańsk
D+H Smoke Control
Seaport customs clearance in
Elblag - making comprehensive fire
protection systems. and CCTV,
burglar alarm system and access
control systems - installation and
commissioning
Elementary School Gym
Lidzbark Warminski
Fire hardening steel
structure
We train
and improve
ourselves
We train
and improve
ourselves

Podobne dokumenty