Att no 1 - List of investments and progress of work
Transkrypt
Att no 1 - List of investments and progress of work
Table No. 1 - List of investments and progress of work RZGW Wrocław No. STRUCTURE TASK (Subcomponent) COMPONENT Measurement Preliminary s, documentation, Zoning permit/Location investigations, Surveying and legal TechnicalEnvironmental permit permit/Local land use calculations documentation ekonomic plan and expert's concept reports Geological, geotechnical, engineering and hydraulic documentation Detailed design Construction permit Other documentation related to environmental protection, e.g. hydraulic project appraisal report, tree survey Other administrative permits Working drawings and Bidding documents Engineer's specifications for works cost estimate (execution design) COMPONENT 1 - Lower and Middle Odra River 1B Protection of Middle and Lower Odra River 1 2 Regulation of the Odra River in the section from Brzeg Doly to the Nysa Łużycka confluence with respect to the following works: Rehabilitation and improvements of river training structures of the free flowing Odra River – reconstruction and improvements of river Reconstruction of river control infrastructure on Odra training structures to upgrade the Odra River section from River. Adaptation to the conditions of Class III Malczyce to the Nysa Łużycka River mouth to Class III waterway roadway. Stage II standard. Stage II Reconstruction of river control infrastructure on Odra Regulation of the Odra River in the section from Brzeg Doly to the River. Adaptation to the conditions of Class III Nysa Łużycka confluence with respect to the following works: roadway. Stage III Rehabilitation and improvements of river training structures of the (1 bridge - Krosno Odrzanskie) free flowing Odra River – reconstruction and improvements of river training structures to upgrade the Odra River section from Malczyce to the Nysa Łużycka River mouth to Class III waterway standard. Stage III yes yes yes yes yes yes yes yes yes no yes no yes no no no no no no no no no no no no no no no no no no 1B.1 COMPONENT 2 - LOOD PROTECTION O KŁODZKO VALLEY 2A - Active protection Construction of the Boboszów dry polder on the Nysa Kłodzka River 1 Construction of "Boboszów" - a dry flood control reservoir on Nysa Kłodzka River and Construction of "Roztoki Bystrzyckie" - a dry flood control reservoir on Goworówka stream yes no no no (Special Law) There are extracts from the land register yes yes no 2A.1 2 Construction of the “Roztoki Bystrzyckie" on the Goworówka creek near the village of Goworówka, Municipality of Kłodzko in Lower Silesian Voivodeship yes no no no (Special Law) There are extracts from the land register yes no no no no no no no 3 Construction of the Szalejów Górny dry polder on the Bystrzyca Dusznicka River yes no no no (Special Law) There are extracts from the land register yes no no no no no no no 4 Construction of the “Krosnowice” dry polder on the Duna creek near the village of Krosnowice, Municipality of Kłodzko in Lower Silesian Voivodeship yes yes no no (Special Law) There are extracts from the land register yes yes no yes no no no no 1 lood protection of the Nysa Kłodzka valley no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no no Construction of "Szalejów Górny" - a dry flood control reservoir on Bystrzyca Dusznicka River and Construction of "Krosnowice" - a dry flood control reservoir on Duna creek 2A.2 2B - Passive protection lood protection of Nysa Kłodzka River Valley lood protection of Ścinawka River Valley 2B.1 2 lood protection of the Ścinawka River valley 3 lood protection of the valleys of the Biała Lądecka River and the Morawka River 4 lood protection of Biała Lądecka River valley and Morawka River and lood protection of Bystrzyca Dusznicka River Valley and Kamienny Potok River. 2B.2 lood protection of the valleys of the Bystrzyca Dusznicka River and the Kamienny Potok River