Project PDF (short)

Transkrypt

Project PDF (short)
Tory wyścigowe
SYMMONS PLAINS, AU
SYMMONS PLAINS
Tory wyścigowe
Projekt
Numer projektu
Ulica
Kod pocztowy
miejsce
kraj/region
Symmons Plains
P15-500940
1487 Midland Hwy
7300
Perth TAS
Australia
Rok instalacji
2016
klient
Projektowanie
Symmons Plains
Geobrugg AG
Situation
Symmons Plains has been largely a construction zone since late last year thanks to a $ 2 million state
government grant to lift safety and presentation standards at the circuit.
Safety work has included the refurbishment of all of the 2.41 km layout’s gravel traps, with 5,000 tonnes
of new gravel to arrest out of control cars and bikes.
A kilometer of earth-filled tyre walls around the inside of the circuit has also been replaced by concrete,
running from partway down the back straight all the way around to Turn 2.
The exit of Turn 2 meanwhile sees a new debris fence installed to protect spectators.
opis
Geobrugg AG was involved in the layout design, manufacturing and delivery of the Geobrugg Debris
Fence for turn 2.
Systemy
FIA debris fence
Inne zainstalowane aplikacje
Tory wyścigowe
wysokość systemu
2.5 m
W razie pytań prosimy o kontakt ze specjalistą Geobrugga.
Jochen Braunwarth
Director Motorsport Solutions
Phone +41 71 466 84 24
Mobile +41 78 737 95 64
[email protected]
Geobrugg AG
Aachstrasse 11 | 8590 Romanshorn | Szwajcaria
[email protected] | www.geobrugg.com
Ein Unternehmen der Gruppe BRUGG | ISO 9001 zertifiziert
Tory wyścigowe | Symmons Plains, AU
2/2

Podobne dokumenty